Safe Work Method Statement
A key risk planning, assessment and control tool used to identify high-risk activities, verify critical controls and confirm sign-on prior to commencing work.
01 How to Use This SWMS
Five steps that align this SWMS with the ANZ Operational Safety System of Work.
02 Site & Work Details
03 Identify Common High Risks
Select all risks relevant to this scope. Open Critical Controls or export a printable Work Instruction for the frontline team.
Safety devices are incorporated into the lists of controls in the Critical Controls section.
If anything is not in line with critical controls or doesn't feel right, stop and escalate before proceeding.
Pre-start checks save lives
Use a tested voltage detector before and after every isolation. Electrical equipment must meet AS/NZS 3760:2010.
04 Other High Risks
Less common Vestas risks identified by Australian safety legislation. Tap a chip to add it to the table.
05 Site-Specific Risks & Exceptions
Other risks (hot works, manual handling, wildlife, drones) and exceptions to critical controls.
06 Critical Controls Guide
Tap a row to expand. Tick controls as they're applied. Export a Work Instruction for any risk.
07 SWMS Sign-On
I have read and understood the contents of this site SWMS, including controls identified for common high-risk areas and any other controls prescribed for less common high risks and site-specific risks. Anything I did not understand has been explained to me to my satisfaction. I agree to follow the SWMS and understand that any control procedures are provided for my safety and the safety of others.